.

Schedule and ProcessProject DetailsSite Analysis

US 93, East US 6 and East US 50 Corridor

US 93

Opportunities & Constraints and Design Synthesis
On December 5th the design team, NDOT, and UNLV conducted a workshop to describe the opportunities located along the US 93, East US 6, and East US 50 Corridor. During the work session they organized the highway into landscape design segments and developed themes for each segment.

The Design Synthesis Report summarizes the design decisions made at the work session. The report consolidates the data that has been gathered and analyzed. The analysis identifies specific locations for aesthetic opportunities and identifies the design direction for highway facilities. Themes, levels of treatment, design objectives, and material palettes are provided for each landscape design segment. This analysis does not, in and of itself, create the landscape and aesthetics corridor plan. Rather, it establishes the framework for future recommendations.

Please click on the link below to access the Design Synthesis report that will be reviewed and commented on by the Technical Review Committees for Nevada's Eastern Highways.

US93 Design Synthesis report - part 1 (2.3 MB)
US93 Design Synthesis report - part 2 (2.7 MB)

 

IntroductionI-80 Urban CorridorI-80 Rural CorridorI-15 CorridorSouthern US95 / US93Central US95 / US6 / US50Northern US395 / US50US93Frequently Asked QuestionsPress ReleasesQuestions and CommentsHome

Accessibility Statement

 

NDOT logo

 

  INTRODUCTION   |   1-80 URBAN   |   I-80 RURAL   |   I-15
SOUTHERN US 95 and US 93   |   CENTRAL US 95, West US 6 & Central US 50 
US 395, West US 50, SR 28, SR 207 and SR 431
   |   FAQ   |   PRESS RELEASES
US 93, East US 6 and East US 50   |   QUESTIONS & COMMENTS   |   HOME